Panama Canal
Transit
28 – June -
2016
An Excellent
Transit
Returning from Isla Tobago, Gehry Bio Museum is the coloured roof panels to left |
We returned
from Vancouver to Taboga Island finding Kanilela
riding Chuy’s buoy happily. Once again Mag’s extensive preparations to leave
the boat had paid off. I arranged for Chuy to have the hull cleaned before I
returned because I knew we had very little time to prepare for our
“line-handlers” arrivals and I did not have time to do it myself as usual.
We decided
to take a berth in Playita Marina for a week to get ready for the canal transit
and to make life easier for our four extra crew as they arrived. It worked out
well as some big winds came up and both La Playita and Las Brisas anchorages
were rough, especially Las Brisas with its chaotic beach access. Our daughter
Bree and her husband Matt arrived from New York in the afternoon, my big
brother Doug flew in from Duncan/Vancouver that evening and finally Bree and
Matt’s friend Joe arrived from New York the following day. With six on board,
dock conveniences were appreciated.
They made it look easy |
We managed
to do some provisioning trips with side trips to the Canal museum at the
Miraflores locks and a trip back to Casco Viejo, the old town.
We were all very
attentive to details at the Miraflores Locks because we were all going through
the canal for the first time. Several people had told us to hire a line handler
or two but I thought we could do it. While we were watching, a sailboat, locking
down to the Pacific while rafted to a Canal work boat, came through and had an
uneventful passage through the two locks. They made it look easy which was
reassuring but going up in the locks is the direction the prop wash and inflow
of water create the worst condition so I was only partially relaxed about what
we had seen and there were no boats going the other direction, up to Gatun
Lake.
Kanilela's Transit Crew June 2016 - thanks for the photo Matt |
I decided to
hire an agent, Erick Galvez from Centenario Consulting, info@centenarioconsulting.com
because we needed
the 4 - 125 foot lines and bumpers and because doing your own registration can
cause delays and finally, we had people on tight schedules. The process went well, the Admeasurer came to
the marina to complete the requisite forms and the
lines and bumpers were dropped off without issue. When we submitted the paper
work on Tuesday we were hoping for a Thursday or Friday date but they were full
so we met our transit advisor, Francisco, about 0800 on Saturday morning,
25-June-2016.
As many of you may know, the canal has
been building a new set of locks for the last many years. The new locks are to
permit wider modern ships of up to 55m (165’) to transist. The old locks are 33.5m
(110’) and the Panamax ships designed to that width were losing out to the
larger ships which were working the Eastern North America/Europe/Middle
East/Far East trade routes. Panama City was covered in ads saying the new canal
would open on Sunday, 26-June-2016. Yep, day two of our transit.
Bridge of the Americas |
Passing under landmark bridges can be
big events for cruisers. For Vancouver sailors departing, the Lion’s Gate
bridge is an emotional moment and of course entering San Francisco under the
Golden Gate was a milestone. The Pacific approach to the Canal is dominated by
the steel Bridge of the Americas and yes, it felt very good to be passing under
the link between North and South America. While waiting to enter the first
Miraflores lock we met another sailboat, Sunrunner,
who would be transiting with us. The freighter, Noble Halo was to enter first, then the canal tug, Pacora, would side tie behind the
freighter, then we would enter and nest to the tug and finally Sunrunner would enter and nest to us.
Sounds easy…
The bow crew, Doug and Joe ready to tie to the Pacora |
And it was! Everyone performed their
tasks perfectly. Our advisor, Francisco and Edward, the advisor for Sunrunner, were great, giving advice
clearly and demonstrating better techniques when beneficial. They were perfect
for a boat load of canal first timers. Paul on Sunrunner had transited the
canal fourteen times and his crew varied from two with extensive experience to
a couple of first timers.
Bree set to take Sunrunners lines |
As the lock closed and filled we did introductions
and shared cruising histories. Once we were at the top of the lock, the forward
gate opened into the second Miraflores lock. To move from one lock to the next Noble Halo went first pulled by the
train mules on the canal side and using his own motor for additional thrust.
After his turbulence had calmed a little, Sunrunner
dropped away from Kanilela and we
then dropped back from Pacora, so
they could advance into the next and final Miraflores lock and repeat the
nesting process again. Tied to a larger vessel that is side tied is the easiest
lockage position, once nested, only the line handlers on the tug at the side
wall have any work.
Thanks Marie for the screenshots, and yes, Matt is in a white shirt! |
Heading out from the second Miraflores Lock into Pedro Miguel Lake |
Bree and Matt had notified numerous
people of the live feed canal cameras and as we were going through Miraflores
they were talking to Marie, Matt’s mom in Pennsylvania. She managed to capture
some screen shots of us rafted, separating and proceeding to the next lock. The
viewing galleries of the lock were packed with people and knowing we had a live
feed audience as well, the pressure was on. We did not want to make history by doing a 360 and bouncing off the walls.
Every person on the deck has a camera ready for some poor skipper who blows it! |
The old canal has three locks rising up 26m
(84’) to the Gatun Lake elevation and three down. From the Pacific side the two
Miraflores locks are first, followed by the Pedro Miguel single lock about one
mile away. Unfortunately, the tug Pacora
was stopping to join a ship in the canal between Miraflores locks and Pedro
Miguel, so our final type of lockage was changed to center chamber.
Another perfect throw |
While
rafted to Sunrunner each line crew
would catch a line thrown with a Monkey Fist to the sailboats from the lock
sidewalls therefore each sailboat would have a bow and stern line to the canal
wall and would have to maintain the correct tension, keeping the sailboats in
the middle of the lock.
Matt and Bree snugging the stern line |
Lock closing |
Again, Doug and Joe on the bow and Matt
and Bree on the stern performed perfectly. It went incredibly smoothly. The Pedro
Miguel Canal staff threw the stern lines to the bow and Matt and Bree ran them
back to the stern thus avoiding getting a Monkey Fist through a solar panel.
Although we have heard of panels being hit one wonders if there were other
dynamics taking place. The Canal crews have competitions throwing Monkey Fists
through 6” diameter circles so we know they can put it where they choose to put
it. With us they were all smiles, as helpful as could be and always tolerant of
my Spanish. Our advisors, Francisco and Edward were great. Textbook locking…. A
note on the advisors. They are Canal employees who work in other departments
and have an opportunity to work as advisors on an overtime basis on sailboats
and yachts. They are not ship’s pilots. Francisco is with the Environmental
Department and Edward is a tug boat captain. Edward loved sharing his knowledge
of the history of the canal so the transit was incredibly informative.
Once out of the Pedro Miguel lock you
enter the Gaillard Cut, a 13.7 km long excavation that killed the original
French effort to build the canal. By building a dam at the Caribbean end of
Gatun Lake and the use of locks to gain the necessary elevation, the American
contractors were able to raise the lake level therefore they did not have to
excavate the Gaillard Cut as much. Still, the tailings from the excavation
provided the fill for the more than one mile long Armador causeway out to the
islands at La Playita
and Las Brisas anchorages.
Just after
clearing the Pedro Miguel Lock the canal passes under the second bridge
crossing the canal, the fairly new Puente del Centenario, a beautiful cable
stay structure. Another milestone moment.
Once out of
the Gaillard Cut at the interior town of Gamboa, the canal buoys start to
wander through the widening arms of Gatun Lake. The lake transit is about 30 km
to the mooring buoy where your advisor gets picked up near the new 55m wide
locks. We were told that the first ship would be coming out of the new locks at
0800 the following morning going southbound and our advisor would be onboard at
some point through the morning to complete our northbound passage in the old
locks. Our mooring buoy was massive, at least 10’ in diameter and flat enough
to run laps on top.
Although we
were close to the new lock, there was a hill blocking our view into the lock.
As the following morning progressed numerous helicopters flew overhead but 0800
passed and no ship appeared. About 10:00 am fireworks started but we only saw
the flashes of the first shots because the wind was blowing our direction and
smoke covered the sky obliterating the following fireworks which continued
booming for a long time. In a word, daytime fireworks are not particularly
effective! Then we continued waiting, and waiting, and waiting…..
History is made! The first ship through the new locks |
At about
noon, with new frenzied activity from the tug boats and helicopters, the bow of
the container ship appeared. She was a Cosco Container ship with banks of grey Cosco
(China Ocean Shipping Co) containers and green Chinese Shipping containers
arranged in a balanced pattern. It was clear who had financed the new locks.
Although the length was no greater than the typical container ships we were
seeing, when she turned stern to, it was apparent how much bigger she was.
Instead of the usual 13 containers wide she held 19 wide. Pretty impressive and
we were there for the historic moment, although admittedly not quite as
historic as 102 years ago when the SS Ancon was the first ship through the
canal.
Canadian sovereignty of our buoy/island |
And the newest Bluewater Cruising Out Station |
As the day
progressed word reached us that there were no advisors available and we would
have to wait on our buoy for the night and hopefully we would get an advisor by
noon the following day. We were in clean fresh water and went swimming although
we had read often that there are crocodiles in Gatun Lake and then proceeded to
claim Canadian sovereignty over our island-like buoy and further to declare it
a Bluewater Cruising Association Out Station. All in all a pretty successful
day in the history of Canadian sailing! Especially good that there was no
mutiny onboard Kanilela with no shore
leave permitted. The monkeys on the shore line jungle were sounding restless.
Paul, from Sunrunner radioed that two of his crew
were not able to stay the night and would we be able to share linesmen with him?
We replied that as long has both advisors were okay with it and the Canal
Authority had us nested for a center chamber lockage the two crews could easily
handle the trip. He took his two departing crew to shore and we have not heard
from them since. Presumably they made it back to Panama City.
About 1330,
1:30pm, Monday our new advisor, Elvie MacMillan, arrived on board. Elvie is an
Engineer with the tugs normally and has worked for the canal for 26 years. He
was a great guy to be with and was really good about sharing his knowledge of
the canal, old and new. We crossed the mouth of the new locks over to the west
to the old Gatun locks, the three locks that would drop us to the Caribbean.
New tug and Seaboard America behind us |
It
was agreed we would raft with Sunrunner
and Kanilela, being larger, would control
our movement through the canal. It was a great trip with the two sailboats first
into the lock, one of the new canal tugs for the bigger locks side tied behind
us and a smaller container ship, the Seaboard
America, in last. In the lock beside us, the Hansa Europa, a large container ship out of Hamburg, paralleled our
progress northbound.
Textbook line handling |
We stayed
nested with Sunrunner through the
entire locking so Kanilela motored up
the center while the dock workers walked the messenger lines through the locks.
When we would arrive at our next set of bollards, the line crews would send the
big lines back to the side to be attached. We only had to catch the Monkey Fist
on the first lock. Down locking is
generally easier but people are constantly warning about the salt water, fresh
water turbulence on exiting the third lock. Kanilela
has a modified full keel and enough power that we did not experience any
problems.
We transferred
Elvie to a Canal tender at the Flats and continued, with lightning flashing
over Colon City, up to Shelter Bay Marina. A huge check mark in Kanilela’s
cruising story and kudo’s to the crew who were now experienced line handlers.
Amazing article, Which you have shared about the shipping service. This article is very interesting and I liked to read it. If anyone looking to hire shipping service, then visit Freight Shipping Company Florida
ReplyDeleteI admire this article for the well-researched content and excellent wording. I got so involved in this material that I couldn’t stop reading. I am impressed with your work and skill. Thank you so much. freight forwarder miami
ReplyDeleteAfter reading this, I got very much knowledge on shipping service because you are giving such good information inside your blog and I would like to say that you share more knowledge with us in the future. Shipping Boxes From USA To Philippines
ReplyDelete